Proposed Shop Office & Budget Hotel, Jalan Petaling No. 1 & 3, Jalan Petaling, Section 21, Kuala Lumpur |
Client : | Winsin Enterprise |
Location : | Kuala Lumpur |
Service Provided : | Construction |
| |
|
 |
Cadangan membina sebuah surau dan sebuah pusat kominiti 4 tingkat yang mengandungi pusat pertubuhan kanak-kanak, pusat warga emas, dewan serbaguna dan ruang pejabat pengurusan, di sebahagian Lot 4652, PPR.Intan Baiduri, Kepong Utara, Mukim Batu Kuala Lumpur. |
Client : | Dewan Bandaraya Kuala Lumpur |
Location : | Kepong Utara, Mukim Batu Kuala Lumpur |
Service Provided : | Construction |
Approximate Contract Value : | RM 9.9 Million |
|
 |
Proposed Bungalow at Templer Park, Rawang, Selangor Darul Ehsan. |
Client : | Thay Peng Kee & Mdm. Teh Bee Choo |
Location : | Rawang, Selangor |
Service Provided : | Construction |
|
 |
Proposed 3 Storey Factory and Office at Lot 30032 Sg. Buloh Industrial Estate, Mukim Sg. Buloh, Selangor Darul Ehsan. |
Client : | Dominion Park Sdn Bhd |
Location : | Sg. Buloh, Selangor |
Service Provided : | Construction |
|
 |
Proposed Factory at Mah Sing Industrial Park, Sungai Buloh, Selangor Darul Ehsan. |
Client : | Xin Chuan Hing / Bohlasia Steel |
Location : | Shah Alam, Selangor |
Service Provided : | Construction |
|
 |
Proposed 18 Storey Condominium "Bukit Robson Height at Bukit Seputih, Kuala Lumpur. |
Client : | YWS Sdn Bhd |
Location : | Kuala Lumpur |
Service Provided : | Design & Consultancy |
|
 |
Proposed 3 Storey Factory and Office at Lot 30032 Sg. Buloh Industrial Estate, Mukim Sg. Buloh, Selangor Darul Ehsan. |
Client : | Central Label Sdn Bhd |
Location : | Sg. Buloh, Selangor |
Service Provided : | Turnkey Contracting |
Approximate Contract Value : | RM 2.2 Million |
|
 |
Proposed 19 Storey Condominium "Forum" at Jalan Tun Razak, Kuala Lumpur |
Client : | Nexus Sdn Bhd |
Location : | Kuala Lumpur |
Service Provided : | Consultancy |
Approximate Contract Value : | RM 2.2 Million |
|
 |
Proposed 14 Storey Apartment at Taman Midah. Cheras, Kuala Lumpur. |
Client : | Mr. Liw Jun Wai |
Location : | Sg. Buloh, Selangor |
Service Provided : | Construction |
Approximate Contract Value : | RM 2.2 Million |
|
 |
Proposed Upgradding od Ami Factory Current Facilities at Jalan Sesiku 15/2, 40000 Shah Alam, Selangor. |
Client : | Associated Motor Industries Sdn Bhd |
Location : | Sg. Buloh, Selangor |
Service Provided : | Construction |
Approximate Contract Value : | RM 2.8 Million |
|
 |
Proposed 20 Units of 4 Storey Shop/Office on Lots 150-164-176 Jalan Lebuh Beringin Port Klang, Daerah Selangor Darul Ehsan. |
Client : | YWS Sdn Bhd |
Location : | Kuala Lumpur |
Service Provided : | Construction |
Approximate Contract Value : | RM 6 Million |
|
 |
Proposed Construction of Citylink Head Quarters at Hicom-Glenmarie Industrial Park, Shah Alam, Selangor Darul Ehsan. |
Client : | Citilink (M) Sdn Bhd |
Location : | Shah Alam |
Service Provided : | Construction |
Approximate Contract Value : | RM 6.5 Million
RM 15 Million |
|
 |
The Slope Protection Works is a subset to Phase 1 of the Lekir Coastal 1Development Project which involves a reclamation area of approximately 151 hectares. Rock armour protection is provided the island against wave erosion and adverse climatic conditions.
Four major operations in this project are:
● Sand slope preparation
● Laying of geotextile fabric
● Placing of filter and armour rock
● Rock pitching work
All except the rock pitching work involve underwater operations.. |
Client : | Van Oord Acz (M) Sdn Bhd |
Location : | Lekir, Perak |
Service Provided : | Construction |
Approximate Contract Value : | RM 17 Million |
|
 |
This project involves dredging, transporting and depositing including leveling some 2,000,000 cubic meters of fill material for the Lumut Port area. The reclaimed land will be developed into industrial lots. The equipment used in this project include cutter suction dredger, crane, pontoon, floating pipelines, sub-merged pipeline, dozers, wheel loaders, excavators and shore pipelines.
This project was successfully completed jointly with Ballast Nedam Groep NV (M) Sdn. Bhd, in a time frame of less than 20 weeks. |
Client : | Limut Maritime Terminal Sdn Bhd |
Location : | Lumut, Perak |
Service Provided : | Construction |
Approximate Contract Value : | RM 12.5 Million
RM 2.8 Million |
|
 |
This project involves the construction of a 270m heavy duty wharf for the load-out of off shore oil & gas jackets and modules. The wharf is designed to an ultimate design depth of -9.0m ACD through a thick layer of marine clay.
It was successfully completed in a period of 12 months, having to overcome severe tidal and tough site conditions. |
Client : | Promet Fabricators Sdn Bhd |
Location : | Teluk Ramunia, Johor |
Service Provided : | Engineering Procurement & Construction |
Approximate Contract Value : | RM 12 Million |
|
 |
This project involves the design and construction of reinforced concrete retaining wall structure along the perimeters, and the inner wall of the shelter deck and the explosive store of two barge which are built to serve as accommodation modules for the Malaysia Navy. The dimension of each barge is 60m x 24m. Shear studs and elastomeric membrane are used to enhance the shear capacity and water proofing capability of the 225mm thick wall respectively. |
Client : | PSC-Naval Dockyard Sdn Bhd |
Location : | Ulau Jerejak. Pulau Pinang |
Service Provided : | Design |
Approximate Contract Value : | RM 680,000.00 |
|
 |
The work involves recovering of excess sand used as slope surcharge for the land reclamation work of the Lekir Coastal Development Project : Phase 1. The excavated sand is transported and dumped at the designated dumping areas, leveled and compacted.
Draglines, excavators, dump trucks and bull dozers are used in this work. |
Client : | Van Oorn ACZ (M) S/B |
Location : | Lekir, Perak |
Service Provided : | Construction |
Approximate Contract Value : | RM 1.4 Million |
|
 |
Maintenance dredging work is carried out at the wharf front of the Promet Fabricators Yard for an area measuring 270m in the length and 110m in width to a depth of -5.0m ACD. The approximate dredging quantity of 60,000 cu.m is disposed off at an approved site some 22km (12 nautical miles) away. The main dredger spread used include a 20 cu.m capacity clamshell dredger, split hopperbarggers, tug boats and some service boats. |
Client : | Promet Fabricators Sdn Bhd |
Location : | Teluk Ramunia, Johor |
Service Provided : | Construction |
Approximate Contract Value : | RM 1.3 Million |
|